How To Build A Hydroseeder

Grass may be planted using the hydroseeding method. Hydroseeding is different from other types of lawn seeding in that it uses a sprayer to apply the seeds directly to the grass. You’ll add water, fertiliser, and mulch to the seeds before planting them. You don’t have to worry about making this combination correctly because it’s readily accessible in the market.

As a result of Hydroseeding, there are several advantages. The most important benefit of this method is that it protects the soil and provides seedlings with ideal germination conditions by mixing nutrients with the water.

Hydroseeders may be built by following these steps. The detailed walkthrough provided here will walk you through each step you’ll need to take. Continue reading to learn more.

A must-have set of tools

A truck and a hydroseeding equipment are all you’ll need to get started hydroseeding. It is, however, important to note that the size of the property you are Hydroseeding will dictate the equipment you need.

Equipment used for hydroseeding includes;

How to Build a HydroseedingMachine

Even though hydroseeding sounds and appears complicated, a good guide will walk you through the process step-by-step. Let’s get started, shall we?

·        The Initial Motor Setup

The machine will only work if you have two motors. Agitation is the only purpose of the first motor. 2-inch garbage pump motors are the only ones that will work. The mixture is pumped from the bottom centre of the tank to the motor intake, where it is agitated five times before returning to the tank. Right side should be halfway up, while left side should be lower than custom fenders and 1 top front as bale buster. Right side should be halfway up.

Slurry is sprayed using the second motor. A 3-inch garbage pump is required for this motor. The pump’s inlets should be located at the bottom of the hydroseed tank’s centre part.

·        Putting the Motors in Place

The motors must be mounted on the trailer after they have been set up. Motor vibration may be reduced by using rubber spacers. It is imperative that the wheel covers have special bolts attached to them and a weight rating of two 7500lbs axel axles. A hitch mount that can be adjusted to match the height of the truck is also recommended.

Installing banjo open/close valves on both motors is a fantastic alternative. You may spray your mixture while stirring it in the tank thanks to the twin motors. It is possible to pass a thicker mix and mulch fibre through a jet agitation while maintaining the spraying pressure if you follow these instructions.

·        Mixing

Mixing can begin at this point. Make certain that the mulch you’re using is uniformly thick and even. You should use 200 gallons of water for every two bags of 3 in 1 hydro cover mix that includes paper and mulch.

5 pounds of 18-24-12 lesco starting seed, 11 pounds of GCI seed, and 12 pounds of Humic 12 can now be added for the rates. The pump should be adjusted at a little over quarter throttle to get this mixture, which will cover around 2100 square feet. Increase the throttle on the pump to produce a considerably thicker mixture.

Hydroseeding Unit Types

Hydroseeding units must be chosen before you begin hydroseeding so that you may achieve your goals. Setting up two hydroseeding devices is demonstrated in the next section.

·        Hydroseeding Jet Agitated Unit.

  • Water should be filled up to roughly three-quarters of the way in the unit.
  • Perform a visual inspection of your vehicle’s engine. A minimum of 50 seconds with the engine running is recommended. To be on the safe side, perform this step prior to adding the ingredients. As a result, use a bale buster to open that valve and shut off all other valves on that units. In the absence of a bale buster, you’ll need to open the agitation valve all the way and close the valve that connects to the discharge hose in order to begin the process.
  • The suitable amount of mulch for your hydroseeding machine must be added. You should always begin loading the machine with mulch, followed by fertiliser and seed.
  • Hydroseeding may now be completed with the addition of other products, such as tackifier and fertiliser, as needed.
  • You must close the bale buster valve and open the agitation valve if your machine contains a bale buster.
  • Add water to the container. Ideally, the tank should be totally full before mixing, although this does not exclude mixing your hydroseed portion by portion.
  • When there are no more clumps, the mixture is ready to use. Only two minutes should be required to complete this procedure. Before you begin sparing, shut the agitation valve.
  • You may start extracting air from the tank when it reaches a height of 6 inches. Make sure the agitation valve is entirely closed to prevent air from being drawn in.

·        Hydroseeding Paddle-Agitated Device.

  • The tank, like the jet agitated unit, must be filled approximately three-quarters of the way with water.
  • Perform a visual inspection of your vehicle’s engine. Starting and letting your engine run for 50 seconds is recommended.
  • Use the paddles to propel yourself forward. Please use the engine at a half throttle when adding the supplies. Slowing down the impellers will allow for a better mix.
  • The suitable amount of mulch for your hydroseeding machine must be added. You should always begin loading the machine with mulch, followed by fertiliser and seed. Using this agitator, you may add whole bundles directly into the tank.
  • Hydroseeding may now be completed with the addition of other products, such as tackifier and fertiliser, as needed.
  • While the engine is running at full RPM, fill the tank with water. To get a good mix, use the paddles while doing this.
  • It’s preferable if you wait until there are no more clumps before you start mixing. Only two minutes should be required to complete this procedure.